Client: Energy Production Company
Year: 2018
Location: Ruvuma Region - Tanzania
Service Provided: Feasibility Study, including drone topographic survey, hydrological study, quality/costs-based analysis
Project:
The location of the project is west of Madaba.
The feasibility study is evaluating different combinations of options concerning the powerhouse positioning, access roads and the waterway layout.
Forebay water level: 995.8 m asl
Jet level: 805 m asl
E-flow: 280 l/s
Penstock diameter: 1200 mm
Multi-jet vertical axis Pelton turbine, with stainless steel runner.