Nogarola SHPP
Feasibility, Final and Executive Design, Tender documents, DL

Client: Indipendent Power Producer
Year: 2010-2013
Location: Taibon agordino (BL) - Italy
Service Provided: Feasibility Study, Preliminary and detailed design, Structural design, Environmental and Landscape impact study, Tender documents for civil works and electromechanical equipment, Assistance in tender award and procurement, Supervision of work.

Project:

Run-of-river SHPP on the large river Cordevole in mountain environment.

Net head:   16,9 m;

Maximum flow rate: 750 l/sec

Penstock diameter 800 mm; Length 290 m

Turbine type:  Francis

Installed capacity: 99 kW

Energy output: 587.000 kWh

Powered By Subgurim(http://googlemaps.subgurim.net).Google Maps ASP.NET