Velezza SHPP
Feasibility, Final and Executive Design, Tender documents,DL

Client: Municipality of Lozzo di Cadore
Year: 2010-2011
Location: Lozzo di Cadore (BL) - Italy
Service Provided: Technical and economic feasibility, preliminary, final and Detailed design, tender documents, environmental impact study, CDM / HS, supervision of works.

Project:

Run-of-river SHPP in mountain environment.

Net head: 202,00 m

Maximum flow rate: 150 l/sec

Penstock diameter 350 mm -  Length 1250 m

Turbine type: Pelton 2 injectors

Installed Capacity:  241 KW

Energy Output: 1.200.000 Kwh

Powered By Subgurim(http://googlemaps.subgurim.net).Google Maps ASP.NET