Sorarù SHPP
Feasibility, Final and Executive Design, Tender documents,DL

Client: Municipality of Rocca Pietore
Year: 2010-2011
Location: Rocca Pietore (BL) - Italy
Service Provided: Technical and economic feasibility, preliminary, final and Detailed design, tender documents, environmental impact study.

Project:

Run-of-river SHPP in mountain environment.

Net head:    94,54 m

Maximum flow rate:    1200 l/sec

Penstock f 800 mm     Length 1091 m.

Turbine type:   2 Pelton turbines, 4 injectors

Installed Capacity 880 KW

Energy Output    3.015.000 KWh

Powered By Subgurim(http://googlemaps.subgurim.net).Google Maps ASP.NET