Pettorina SHPP
Feasibility, Final and Executive Design, Tender documents, DL

Client: Indipendent Power Producer
Year: 2010-2013
Location: Rocca Pietore (BL) - Italy
Service Provided: Technical and economic feasibility, preliminary, final and Detailed design, tender documents, environmental impact study, assistance for procurement and tender award, supervision of work.

Project:

Run-of-river SHPP in mountain environment.

Net head:    79,93 m

Maximum flow rate:    1200 l/sec

Penstock f 900 mm     Length 1835 m.

Turbine type:   2 Francis turbines

Installed Capacity 740 KW

Energy Output: 2.770.000 KWh 

Powered By Subgurim(http://googlemaps.subgurim.net).Google Maps ASP.NET