Rite 1 SHPP
Feasibility, Final and Executive Design, Tender documents, DL

Client: Indipendent Power Producer
Year: 2009-2010
Location: Cibiana di Cadore (BL) - Italy
Service Provided: Technical and economic feasibility, preliminary, final and Detailed design, tender documents, environmental impact study, CDM / HS, supervision of works

Project:

Run-of-river SHPP in mountain environment.

Net head:  174,89 m

Maximum flow rate:    300 l/sec

Penstock diameter 500 mm; Length 1620 m

Turbine type:   Pelton, 2 injectors horizontal axis

Installed Capacity: 450 KW

Energy Output: 2.400.000 KWh

Powered By Subgurim(http://googlemaps.subgurim.net).Google Maps ASP.NET