Client: Indipendent Power Producer
Year: 2009-2010
Location: Cibiana di Cadore (BL) - Italy
Service Provided: Technical and economic feasibility, preliminary, final and Detailed design, tender documents, environmental impact study, CDM / HS, supervision of works
Project:
Run-of-river SHPP in mountain environment.
Net head: 174,89 m
Maximum flow rate: 300 l/sec
Penstock diameter 500 mm; Length 1620 m
Turbine type: Pelton, 2 injectors horizontal axis
Installed Capacity: 450 KW
Energy Output: 2.400.000 KWh