Funesia SHPP
Feasibility, Final and Executive Design, Tender documents,DL

Client: Municipality of CHies D'Alpago
Year: 2009-2012
Location: Chies D'Alpago (BL) - Italy
Service Provided: Technical and economic feasibility, preliminary, final and Detailed design, tender documents, environmental impact study, CDM / HS, assistance in tender award, supervision of work.

Project:

Run-of-river SHPP in mountain environment.

Net head: 171,88 m

Maximum flow rate:  600 l/sec

Penstock diameter 600 mm; length 1900 m

Turbine type: Pelton, 4 injectors, vertical axis

Installed Capacity: 741 KW

Energy Output: 2.500.000 KWh

Powered By Subgurim(http://googlemaps.subgurim.net).Google Maps ASP.NET