Rite 2 SHPP
Feasibility, Final and Executive Design, Tender documents

Client: Indipendent Power Producer
Year: 2010-2011
Location: Ponte nelle Alpi (BL) - Italy
Service Provided: Technical and economic feasibility, preliminary, final and Detailed design, tender documents, environmental impact study.

Project:

Run-of-river SHPP in mountain environment.

Net head:    212,94 m

Maximum flow rate: 450 l/sec

Penstock diameter 600 mm   Length 3.925,00 m

Turbine type:   Pelton, 4 injectors

Installed Capacity: 743 KW

Energy Output:  4.600.000 KWh

 

Powered By Subgurim(http://googlemaps.subgurim.net).Google Maps ASP.NET