Maresi
Feasibility Study

Client: Energy Production Company
Year: 2016
Location: Bungoma County, Maresi village - Kenia
Service Provided: pre-feasibility study: site identification and assessment, topographical survey; feasibility study: final design, power evacuation study and business plan

Project:

Run-of-river SHPP with a 4m high and 72 m long diversion dam;
1811 m long headrace open canal and three 98 m long steel penstocks,
Penstocks’ diameters: 1800-1500-1300 mm.

Gross head: 39 m

Turbine: 3 Francis groups

Design flow rate: 21 m3/s

Installed capacity: 7.1 MW

Energy output: 27 GWh

 