Rite
Final Design, Executive Design, DL

Client: REGIONE VENETO - Genio Civile Authority of Belluno
Year: 2003-2006
Location: Cibiana di Cadore (BL) - Italy
Service Provided: survey, research, landscape impact analysis, environmental impact assessment, hydraulic evaluation, final and executive design, DL.

Project
Hydraulic works in river Rite's basin in Cibiana di Cadore (BL-North Italy) performed as part of implementation works as stated in law n°23 12.23.1996 “Institutional Agreement for preservation of Soil and Shore Regions”. The area is known for its serious hydro-geological risk, one of the highest within the Belluno Province area.  Upgrading and improvement of existing hydraulic structures and their implementation consisted in:

-Interventions aimed at reducing the erosive action of the stream by diminishing the amount of solid sediment transportation

-Functional and environmental recovery of landslide slopes, drainage works and environmental re-composition works, conducted subsequently to bioengineering evaluations.

Given the public funding available, priority was given to boosting the pre-existing defence structures built to shield the town of Cibiana.