Rio Castello
Feasibility Study, Final and Executive Design, DL

Client: Energy Production Company
Year: 2007-2012
Location: Livinallongo del Col di Lana (BL) - Italy
Service Provided: Survey, technical and contractual advice, works design, planning and construction works coordination, safety checking.

Project:

Study for the realization of a Micro Hydro Power Plant on the run of Rio Castello River, 1641,50 m a.s.l..Water is fed from a reservoir into a Pelton 4-jet turbine, positioned in the power house, which will be built near the small town of Cernadoi, and is going to be re-fed into the river at the end of the process. Extra care has been put into guaranteeing the Environmental Flaw as established by the “Implementation Rules for water resources management in the basins of Rivers Isonzo, Tagliamento, Piave, Brenta, Bacchiglione”law, issued in year 2004. Downstream flaw will be constantly monitored by a measuring device located in the recess of the bridle that will be able to shut water's derivation if the flow rate falls behind Environmental Flaw's set limits.

Powered By Subgurim(http://googlemaps.subgurim.net).Google Maps ASP.NET